RoadKing
Silver Member
Behind my new retirement  place ( if all goes well ) is a 5' high + 15' wide + 60 ft long berm of fill that covers a 2" sewer line that runs from my septic tank to the leech field. The line couldn't be buried because of the ledge in the backyard. As you can see in pic #1it looks like crap. I decided to cut into it and put up a retaining wall and try to hide it. I started July 4 by putting in 4 stones while dtarting on #5 I hit the sewer line which was six feet from where it was supposed to be pic # 2. 
This weekend I put in the corner and six others pic #3. At this point I'm pretty happy that the project will do what I want it to.At this point the wall will make a 90% right turn and run on for about 50 to 60 ft. In this run will be a set of steps and a firepit made from old cobblestones pic #4.
All my other walls are made of huge boulders that were blasted out of the foundation so I wanted to keep a rustic look I found the old street curbings locally and cut a pretty good deal on them pic #5. I'm just hoping I have enough to finish.
				
			This weekend I put in the corner and six others pic #3. At this point I'm pretty happy that the project will do what I want it to.At this point the wall will make a 90% right turn and run on for about 50 to 60 ft. In this run will be a set of steps and a firepit made from old cobblestones pic #4.
All my other walls are made of huge boulders that were blasted out of the foundation so I wanted to keep a rustic look I found the old street curbings locally and cut a pretty good deal on them pic #5. I'm just hoping I have enough to finish.
 
				 
 
		 
			 
			 
			 
			 
			 
 
		
 
 
		

 
			 
			 
			 
 
		 
			 
 
		