I accepted a bid from a company to pave one of my driveways 15 MONTHS ago.
They finally got around to doing it yesterday.
For the most part, it went well.
The drainage grate for the sidewalk was lowered more than I wanted but walking on or over it isn't bad.
It was supposed to be 4" deep. I can see in places it's 8-10" deep. Good for me.
I was surprised and impressed with the size of the crew and equipment they brought. In total, there were 11 trucks (including 2 18-wheelers and 2-3 tri-axle dump trucks and at least 14-16 crew. They even had flagger people for traffic.
Before:

During



After


They finally got around to doing it yesterday.
For the most part, it went well.
The drainage grate for the sidewalk was lowered more than I wanted but walking on or over it isn't bad.
It was supposed to be 4" deep. I can see in places it's 8-10" deep. Good for me.

I was surprised and impressed with the size of the crew and equipment they brought. In total, there were 11 trucks (including 2 18-wheelers and 2-3 tri-axle dump trucks and at least 14-16 crew. They even had flagger people for traffic.
Before:

During



After

