My fitness center is a 39" Oak stump in the back yard. Left from the big Pin Oak we had to bring down last fall. I have five stacks of limbs cut at 14" to 16" I need to split. Each stack measures 4 feet high by 8 feet long.
That sucker was massive.
This week end will be up near 60F. The Owl sculpture is done and must be moved from the front yard up to the house. At 8 feet high and 39 " at the base, it weighs about 800 lbs. I still haven't yet figured how I'm gonna do it.
However, the sawdust surrounds the work in a 10 foot circle and is about 6 inches deep on the lawn and decking. I have to clear that up. The eight foot by eight foot temporary deck needs to be removed as well. I may build a 3/4"plywood deck ramp and use a pallet jack to lift and move it up the hill.
That sucker was massive.
This week end will be up near 60F. The Owl sculpture is done and must be moved from the front yard up to the house. At 8 feet high and 39 " at the base, it weighs about 800 lbs. I still haven't yet figured how I'm gonna do it.
However, the sawdust surrounds the work in a 10 foot circle and is about 6 inches deep on the lawn and decking. I have to clear that up. The eight foot by eight foot temporary deck needs to be removed as well. I may build a 3/4"plywood deck ramp and use a pallet jack to lift and move it up the hill.
Last edited: