• Please be sure to read the rules and adhere to them. Some banned members have complained that they are not spammers. But they spammed us. Some even tried to redirect our members to other forums. Duh. Be smart. Read the rules and adhere to them and we will all get along just fine. Cheers. :beer: Link to the rules: https://www.forumsforums.com/threads/forum-rules-info.2974/

How to refinish a deck… the HARD way!

Mark1911

Well-known member
SUPER FF Supporter
My deck off the back of the house has been deteriorating for several years, and while I could offer a dozen excuses as to why it’s taken so long to get to it, but…. Yea. I really haven’t kept up with the price of redwood, but let’s just say that when I priced out all new wood, my estimate was somewhere in the neighborhood of 2k. So I thought “what the hell” - I’ll refinish what’s there.

Needless to say, the condition of the wood was beyond anything short of straight-up painting, and I really prefer a stained deck. I sanded exactly TWO of the railing support spindles before realizing that there was NO WAY I was going to do that with the 120ish spindles - so I unscrewed and removed them and sanded them 6 at a time with 36 grit belt sander, then 120 grit random orbital.

IMG_1824.jpeg

IMG_1822.jpeg

Once I had all those prepped, I figured what the hell again, and removed the railing boards and deck surface boards for sanding in the garage. That’s one of the things I notice the older I get - I really prefer to work on stuff at waist level. Plus it’s the only way to really get all the old paint off the boards.

IMG_1849.jpeg

IMG_1850.jpeg

IMG_1853.jpeg

I did the same with the stair treads and risers. That left only the side trim boards, stair frames and support posts to be sanded and stained in place - everything else was stained in the garage.

IMG_1976.jpeg

Reassembly went swimmingly - started with the stairs, then the deck surface, then the railing, then the spindles.

IMG_1978.jpeg

IMG_1980.jpeg

IMG_1982.jpeg

IMG_1987.jpeg

IMG_1988.jpeg

The end result ain’t perfect by any means, but it’s a helluva lot better than it was, and between sanding materials, stain (oil base) and screws, I think I spent around $200 and about 50ish hours of my time…
 
My deck off the back of the house has been deteriorating for several years, and while I could offer a dozen excuses as to why it’s taken so long to get to it, but…. Yea. I really haven’t kept up with the price of redwood, but let’s just say that when I priced out all new wood, my estimate was somewhere in the neighborhood of 2k. So I thought “what the hell” - I’ll refinish what’s there.

Needless to say, the condition of the wood was beyond anything short of straight-up painting, and I really prefer a stained deck. I sanded exactly TWO of the railing support spindles before realizing that there was NO WAY I was going to do that with the 120ish spindles - so I unscrewed and removed them and sanded them 6 at a time with 36 grit belt sander, then 120 grit random orbital.

View attachment 210000

View attachment 210001

Once I had all those prepped, I figured what the hell again, and removed the railing boards and deck surface boards for sanding in the garage. That’s one of the things I notice the older I get - I really prefer to work on stuff at waist level. Plus it’s the only way to really get all the old paint off the boards.

View attachment 210003

View attachment 210004

View attachment 210005

I did the same with the stair treads and risers. That left only the side trim boards, stair frames and support posts to be sanded and stained in place - everything else was stained in the garage.

View attachment 210006

Reassembly went swimmingly - started with the stairs, then the deck surface, then the railing, then the spindles.

View attachment 210007

View attachment 210008

View attachment 210009

View attachment 210010

View attachment 210011

The end result ain’t perfect by any means, but it’s a helluva lot better than it was, and between sanding materials, stain (oil base) and screws, I think I spent around $200 and about 50ish hours of my time…
Very nice! (y) (y)
 
My deck off the back of the house has been deteriorating for several years, and while I could offer a dozen excuses as to why it’s taken so long to get to it, but…. Yea. I really haven’t kept up with the price of redwood, but let’s just say that when I priced out all new wood, my estimate was somewhere in the neighborhood of 2k. So I thought “what the hell” - I’ll refinish what’s there.

Needless to say, the condition of the wood was beyond anything short of straight-up painting, and I really prefer a stained deck. I sanded exactly TWO of the railing support spindles before realizing that there was NO WAY I was going to do that with the 120ish spindles - so I unscrewed and removed them and sanded them 6 at a time with 36 grit belt sander, then 120 grit random orbital.

View attachment 210000

View attachment 210001

Once I had all those prepped, I figured what the hell again, and removed the railing boards and deck surface boards for sanding in the garage. That’s one of the things I notice the older I get - I really prefer to work on stuff at waist level. Plus it’s the only way to really get all the old paint off the boards.

View attachment 210003

View attachment 210004

View attachment 210005

I did the same with the stair treads and risers. That left only the side trim boards, stair frames and support posts to be sanded and stained in place - everything else was stained in the garage.

View attachment 210006

Reassembly went swimmingly - started with the stairs, then the deck surface, then the railing, then the spindles.

View attachment 210007

View attachment 210008

View attachment 210009

View attachment 210010

View attachment 210011

The end result ain’t perfect by any means, but it’s a helluva lot better than it was, and between sanding materials, stain (oil base) and screws, I think I spent around $200 and about 50ish hours of my time…
Helluva Job!! That looks awesome!
 
I can fully appreciate the work there. Very nice.

I've been working on our deck this summer but opted for the more expensive option which came out close to what you estimated for yours. I'm not done yet as I have to stain the remaining portion of the deck but as ours covers the entire side of our 2400 sqft home in 3 levels, I resurfaced one 16x16 section off our bedroom. 20260709_125809.jpg20260708_141007.jpg20260708_140918.jpg20260708_121517.jpg20260707_141616.jpg
 

Attachments

  • 20260706_183702.jpg
    20260706_183702.jpg
    1.8 MB · Views: 12
I can fully appreciate the work there. Very nice.

I've been working on our deck this summer but opted for the more expensive option which came out close to what you estimated for yours. I'm not done yet as I have to stain the remaining portion of the deck but as ours covers the entire side of our 2400 sqft home in 3 levels, I resurfaced one 16x16 section off our bedroom. View attachment 210044View attachment 210045View attachment 210046View attachment 210047View attachment 210048
Damn, that’s quite a deck. I can’t imagine the work you’ve put into that. Looks like a very nice place to spend time. Mine is really only a home for my charcoal kettle and pellet smoker…:-)
 
I needed to re-finish one of my decks.
I found the easiest way to remove old stain is using a pressure washer (with a floor scrubber for the floors). Takes the old stain off pretty quickly. It may need a little sanding when done.
No way I could have used your disassembly approach on the deck I just re-did. Removing the railings isn't really viable.
1787589546183.jpeg1787589569925.jpeg
 
Perfect timing as my wife is off this week from work so we can concentrate on phase 2 of our deck project which is building a 12x18 metal gazebo over the hot tub on the lower deck. I'm still working on the deck surface smoothing it out with a grinder and sanding disc. Then I'll stain it a solid cedar. We started assembly on the Gazebo this morning. It went smooth so far. We got as much as we could done today as there's rain and thunder later in the week forecast. Assembly started with the two provided Allen keys. My wife and daughter assembling posts while I did as well. My redneck ingenuity kicked in after about 10 screws. I set up a ratchet and socket with the correct bit. Used that for a bit while the girls were looking over as I was quickly catching up. It became a race. I put the ratchet down and they snapped it up. Ok...I can outdo them...out came the dewalt drill and correct bit attachments. The girls admitted defeat and we worked as a team that point forward. Lmao

20260824_154945.jpg20260824_155106.jpg20260824_155317.jpg
 
Last edited:
After 3 full days of work with both my wife (giving directions) and I (taking them) and the assistance of one of our kids, we managed to get the Gazebo done. We still have to install the solid wall curtains and mesh. I picked up 2 jigs of Thompsons water seal solid cedar to finish the deck to match the wood on ours. 20260827_161457.jpg20260827_161428.jpg20260827_161404.jpg
 
Don't mean to hijack your thread.

I spent the day today refinishing the lower deck and applying the first coat of stain. I spent roughly 2hrs on my knees with a grinder and sanding disc smoothing out the deck boards and removing the old deck stain. It's going to need a second coat.
 

Attachments

  • 20260828_101451.jpg
    20260828_101451.jpg
    2.4 MB · Views: 8
  • a24d986d-57fd-4ea5-ae9d-cf5ad455fb0a.jpg
    a24d986d-57fd-4ea5-ae9d-cf5ad455fb0a.jpg
    2 MB · Views: 6
  • 20260828_160952.jpg
    20260828_160952.jpg
    2 MB · Views: 5
  • 20260828_161039.jpg
    20260828_161039.jpg
    1.5 MB · Views: 8
We were at camp for the weekend and got home this morning. After breakfast I got to work first adding a second coat of stain on the lower deck.
20260830_151727.jpg

By lunchtime I was done that and decided to tackle the railings on the deck off our kitchen. It's now 3:49pm and I have the first coat of stain on the outside one coat done. 20260830_151654.jpg20260830_151718.jpg
 
I finally drug up my floor jacks from the garage to level the deck on the kitchen. What happened was about 5ish years ago, we had a bunch of snow. We paid for someone to Shovel the roof. They left a 4ft pile of snow on the deck. It got warm. The snow melted into a 3 ft layer of ice which snapped a support beam underneath. I jacked it as level as I could with ice cold water running down my back and intended to finish leveling it in the warmer weather which never happened. 20260901_142225.jpg20260901_142320.jpg20260901_142340.jpg

I started on the first layer of stain on the inside railing.
20260901_153237.jpg
 
I started off the day by working on some bottom trim boards to finish off the ends of the lower support beams. 20260902_121730.jpg20260902_121737.jpg

Then I tackled the outside of the kitchen deck with stain. 20260902_135923.jpg
 
I'm back working on the deck since it's not raining. But wow...wind! All day. While I was waiting for the deck to dry this morning I decided to move the gazebos on the kitchen deck as we're getting rid of the smaller one over the BBQ and moving the bigger closer to the house. Our friends are taking the smaller one so I positioned it closer to the railing so we can lift it over later.

By the time I was done bolting down the bigger one in it's new location, the deck rails were dry enough to begin staining. I've done 2 coats so far. I have one side left on the outside then on to the deck surface. 20260909_124455.jpg20260909_144835.jpg20260909_150630.jpg20260909_153121.jpg20260909_150604.jpg
 
The outside is done. I started on the deck surface however I will run out of stain soon. 3rd can so far for the entire project at $47.99 on sale. So far I'm impressed with the stuff. We'll see how long it lasts. 20260910_123209.jpg20260910_125419.jpg20260910_142048.jpg
 
Just a few touch ups to do and replace the furniture and the stain marathon of 26 is done. It wasn't that bad this time. We won't be changing the color anymore so a quick touch up every few years on the surface and it should last a while. 20260916_143926.jpg
 
My wife stayed in the city for a meeting this evening so I decided to install the wall panels on the new gazebo. It also has the mesh for summer. 20260916_185523.jpg20260916_185121.jpg20260916_192838.jpg20260916_192857.jpg
 
I installed the metal roofing yesterday on the covered stairs. The deck project is now complete for this summer. I already plan another coat of stain on the kitchen deck next summer as well as a few other plans to repurpose some materials from our seasonal campsite and make a nice outdoor kitchen with bar area. 20261005_123815.jpg20261005_123827.jpg
 