Got the rest of the head studs out today, tomorrow break down the heads, the new crank, balancer, aluminum main caps and girdle showed up from 440 source, the Molnar rods are on the way as well as the Sfi flex plate, when I get the heads broke down and the rods and flex plate show up I can take take everything to the machine shop, the block gets tanked, line bored and honed, the heads get valve guides and a valve job with new seals. The rotating assembly will be balanced and the pistons removed from the old rods with the pin pressed in, when it goes back together it will have floating pins with locks. I figure with the help of AI google that my engine combination should go around 300 1/4 mile passes before it needs freshened up, that’s several years worth for me.