• Please be sure to read the rules and adhere to them. Some banned members have complained that they are not spammers. But they spammed us. Some even tried to redirect our members to other forums. Duh. Be smart. Read the rules and adhere to them and we will all get along just fine. Cheers. :beer: Link to the rules: https://www.forumsforums.com/threads/forum-rules-info.2974/

70 Cuda race car

IMG_5424.jpeg
IMG_5425.jpeg
 
Worked on the roll bar cleaning, it’s 99% done on the inside of the car now, just have to go back and clean up a few areas at intersections, also cleaned the roof inside, again after a wire wheel and a wire brush it came off and is smooth without pits, I’m amazed. Still have to clean the bars that extend under the hood and in the trunk. Then it’s time to pull the motor and break everything down and see what I have.
 
Parts showed up for the wife’s 68 Cuda, plus it’s time for the mountain trips, I’ll work on it when I’m home from the mountain, the weather is heating up, by July I’ll only be able to work on it until 10-11 am as it will be too hot and not any fun at all until the end of September.
 
This morning after chores, I got about 3 hours in before it got hot, got the trans mount free
Front motor plates free
Wiring that was a rats nest and will never go back
Headers off the motor
Rigged up and ready to pull except I need to remove the driveline first
After I get it partially out I can access the shifter cable
Tomorrow I have to go to Modesto after chores so I won’t be able to get back on it til Thursday
the remote oil filter assembly and trans cooler will come out with the motor
Should come out easily then drop the transmission off to be inspected and break the motor down to see what I have and check everything if it’s what I need.
 
Pulled the motor and trans together, now the trans goes to the trans shop to be checked out and the motor gets both ends opened up, weather isn’t too hot today so I may or may not go back down and start tearing it apart.
 
Today I started the disassembly, what I learned
has trw .030 trw L 2295 pistons standard stroke 12:1 compression
has roller cam, haven’t figured out the specs. If it’s not stamped on the cam I can use a degree wheel and indicator to figure it out.
Ductile iron adjustable rocker arms
Factory rods with arp bolts/ plan on upgrading to aluminum rods.
Forged crank
Head studs
Factory 2 bolt main caps/ add studs and a girdle.
Desirable ported 906 heads with 2.080 in and 1.74 ex. Valves
Depending on the cam, 610- 650 hp on an engine calculator.
with 5.14 gears and 32” tires, that’s 7000 rpm give or take. 9.90 - 10.50, right where I want to be in the beginning.
The upgrades won’t be too painful and if I want to go faster I can build a gen 3 hemi while I’m racing this engine, the aluminum rods will go several seasons before needing replaced, so I’ll have some time to figure if I want to do that or not, the cage in the car will tech for 8.50 if I do build the hemi the transmission internals can be reused in another case that will fit the hemi ( small block) pattern. As soon as I figure the cam out I have enough info to get the mechanical injection going. Kick the tires and light the fires.
 
Got it completely disassembled
Found numbers and manufacturer on the cam snout, Crane roller 260 degrees @.050. 108 lsa 4000-7000 operating range lobes look good.
Has a gear drive I’ve never seen before, can anyone identify it?
Bubba nick caused some drama starting it up a bunch of times without oil pressure couple bearings were shiny and had some Babbitt transfer to the crank that’s already .020 should either polish off or turn to .030
The piston pins are pressed into the rods but have lock grooves, so eagle rods will work as floating pins with the pistons, pistons are out dated and a little heavy but will work.
I’m going to order a 440 source girdle assembly that will require studs to be installed, so when the kit shows up I’ll take the block, heads and rotating assembly to the machine shop and go from there.
I’ll get back on the car while I’m waiting on parts and machine work, took the transmission to the trans shop yesterday to be checked out.
 
Got the rest of the head studs out today, tomorrow break down the heads, the new crank, balancer, aluminum main caps and girdle showed up from 440 source, the Molnar rods are on the way as well as the Sfi flex plate, when I get the heads broke down and the rods and flex plate show up I can take take everything to the machine shop, the block gets tanked, line bored and honed, the heads get valve guides and a valve job with new seals. The rotating assembly will be balanced and the pistons removed from the old rods with the pin pressed in, when it goes back together it will have floating pins with locks. I figure with the help of AI google that my engine combination should go around 300 1/4 mile passes before it needs freshened up, that’s several years worth for me.
 
The tunnel ram I bought on eBay showed up yesterday, no one makes a tunnel ram for a rb mopar that has a top plate for a mechanical injector. Indy makes one that fits there aluminum heads that have max wedge ports, much bigger than the 906 ports and you can’t open them that big without getting into water and push rod holes, my plan is to cut around the perimeter of the plenum just under the carburetor bases then mill it flat, weld on a piece of 1/2” aluminum flat bar the correct width then make the correct penetration and bolt pattern for the mechanical injector throttle body.
 
Today I finished removed all the valves from the heads, then removed the plenum from the tunnel ram, cut the top off with a cut off wheel then milled it flat and cleaned up the inside and outside perimeter, now I need an injector or at least the gasket to weld on a 1/2” plate and make the pennetration and bolt pattern. Also need to blend the manifold runners to the plenum, as you can see in the picture there is some miss matching going on.
 
Today’s task was to CC a chamber to see if the heads had been milled to calculate the compression ratio.
All it takes is leveling the head, a piece of lexan or plexiglass with a small hole, put some grease on the valves, put them in the head, then some grease around the perimeter of the chamber to seal the lexan and add liquid, ( I used windex so I could see it) until all the air is out using a graduated syringe to measure the volume. In my case the heads have not been milled, it added up to 88 cc which is the OE size.
 
I’m waiting for the rods to show up so I can take everything to the machine shop, I’m in a holding pattern on the engine until the parts show and then the machine work, likely to be a month or more. I’m headed to the work cabin for another round then be back in the middle of next week, and back on the car part.
 
There in those boxes are
440 source forged crank
Aluminum main caps
Girdle
Molnar rods
Solid roller lifters
SFI dampener
SFI flex plate
Hurst 1/4 stick shifter
Hurst line lock
Just ordered an Enderle bug catcher mechanical injector, I still have an 80-a injection pump and shut off valve.
When that shows up I can finish the tunnel ram.
The block and heads go to the machine shop in the next couple days to get line bored, honed and valve guides in the heads, measured for modern valve springs for the solid roller cam I imagine I won’t get it back for a month, but that gives me time to work on the car itself, tomorrow I’m ordering a set of CalTrac bars and Viking double adjustable shocks.
I need to patch some penetrations in the firewall
And paint the firewall and frame before the engine goes back
The transmission has been inspected and it has good hard parts but the forward clutches are shot and the torque converter has been sent out to be inspected and serviced as necessary. Still need to buy slicks and skinny’s.
I would like to take it to Kingdon in January 27 and should get it going for testing sometime in the fall, of coarse it’s hot now so I can only work on it until it gets hot, right now that 11 am, plus I’m going back and forth to the cabin every two weeks to finish that. I think I need to back to work so I can some rest, retirement is wearing me out.
 
Enderle bug catcher injector and leak down tester to flow it for idol showed up today, no gasket came with it, my bad assumed with a new one I would get a gasket, I’ll order one Monday then get the tunnel ram finished.
 
You'd sure like to be where I live. I'm about 15 minutes from Lane Automotive.
If you haven't heard about them, look them up. Their main warehouse is at least 300,000 sqft. Look up the history. Local gearhead started the business out of his garage in Watervleit.
He also started and owns Alstar.
 
Made the plate to cap the plenum on the tunnel ram to mount the injector to from 1/2” 6061, now ordering some .045 wire to weld it on, then when my injector gasket shows up I can cut the penetration and drill and tap the mounting holes.
 
Top