Well, I quit watering it sometime over the weekend. Since it's a sidewalk, it will see no load at all. It's as white as can be and looks great. The contractor I had do it is a good guy if you can wait on him to fit you in. I had so many projects for him to do it took a few weeks to finish them all up but I'm happy
It's got a brushed finish across the walk inside of the edger lines and brush finish with the edger marks on the outside if you can envision that. It's a 4' wide walk with a 6" edger tool on each side.
He did some yard grading work, burying the sump pump line, stump removal, drive graded with 6" of road millings on top of the original gravel. I need to water the drive and start packing the road millings with the tractor on Friday.